Wednesday, January 30, 2008

Sink Test

That's a good sign - the sink fits the cutout in the plywood. Now hopefully I lined up the sink opening on the counter with the opening in the plywood. We'll find out soon enough. That is one large sink BTW - I would expect there to be no toothpaste on the counter with a target that big... :)

Tuesday, January 29, 2008

Back to our regularly scheduled programming...

Just need to spray texture the ceiling in the shower and paint it and it is done. Yippee. The door really dresses up the shower and it actually looks pretty darn nice if I do say so myself.

Poured the countertop this past weekend so hopefully that'll be ready to go soon...

Wednesday, January 09, 2008

Got a little sidetracked...

Decided my daughter's room needed some lighting (thanks Spiccoli for the inspiration although I don't need anymore freakin' projects ya bastage).

Actually, a pretty easy job - I'll probably do the same in the office too. Now getting rid of the rat(s) in the attic may be a bigger project.

And I think I've been talked into tiling the ceiling of the shower too. Sheesh. It never ends...

Saturday, January 05, 2008

Just a measly 5.5 months later...

And the shower tile is D-U-N. Sweet mother of pearl, that took awhile. I just need to silicone the corner joints and at the bottom and then install the door and the shower is complete. Oh wait, forgot, the ceiling was out of whack by 1/4" over a 42" span so I'll need to float that and texture. Then paint and then done.

So nice to see the hardware in there. Now it looks like a real shower!